ArchiveSCV
the-signal.com. The Santa Clarita Valley Signal. Back to the collection.

· signalscv.com, Wayback capture

SCV Voices

CLWA greets 2015 head-on

Part 2 of 2

Will 2015 be as challenging for water professionals as 2014 was? There’s no way to tell unless you have an actual functioning crystal ball — and we don’t — but one thing is certain: as demonstrated in 2014, the Castaic Lake Water Agency is prepared to take on whatever challenges 2015 may offer.

Of course, we expect to continue dealing with the long-term impacts of California’s drought. And, we’ll not only continue building upon past successes, but also embark upon new efforts to help the Santa Clarita Valley cope with the drought and continue to have a safe, reliable supply of quality water, well into the future.

Just as we did when looking back at 2014, our look ahead at 2015 starts with the water industry’s most pressing current topics, drought management and water use efficiency.

SCV Water Use Efficiency Strategic Plan

You may have heard of the state’s “20 percent by 2020” conservation goal. Initiated by then-Gov. Arnold Schwarzenegger in 2008, it calls for a 20 percent per capita reduction in statewide water use by 2020. We’re supporting that goal and we’ve long advocated not only for water conservation, but also a permanent water use efficiency ethic.

To that end, over the past year and a half CLWA and four local water retailers have been developing the SCV Water Use Efficiency Strategic Plan. It’s not only a road map to achieve the “20 percent by 2020” goal, but also a tool to help build that permanent water use efficiency ethic. In 2015, we’ll continue existing plan programs, and we’ll begin adding new ones. Among the existing programs:

- School education programs that reach over 13,000 students a year

- Residential and commercial/institutional/industrial (CII) turf replacement programs

- Residential and CII programs offering free weather-based irrigation controllers

- Rebates for high efficiency clothes washers (residential and CII)

Future programs outlined in the plan include:

- School building retrofits

- Pre-rinse spray nozzles

- High-efficiency fixture installation for low-income customers

- Soil moisture sensor rebates

- Pool cover rebates

These programs not only promote efficient water use, but also help ratepayers save money on their water bills. The SCV Water Use Efficiency Strategic Plan also outlines conservation programs that can be offered by the SCV’s four water retailers, so ratepayers should be on the lookout for those too.

Planning for the future

In 2014, CLWA completed a water resources reconnaissance study, a valuable planning tool that examines traditional and nontraditional ways to enhance local water supplies. In 2015, we’ll apply the results of that study to our long-term water supply planning efforts. As we’ve said previously, maintaining a diverse water supply portfolio has been the key to enduring droughts without imposing draconian measures like rationing and water rate penalties. We expect water supply diversity to become increasingly important — so no stone will be left unturned in our efforts to drought-proof the SCV.

In 2015, we will be planning and designing new wells that will be drilled for dry year supply and to replace certain wells that were taken out of service due to perchlorate contamination that originated from the former Whittaker-Bermite munitions manufacturing facility in the center of the SCV. We will also be collaborating with the California Department of Water Resources and our partner State Water Project agencies to improve imported water supply reliability with the implementation of the Bay Delta Conservation Plan (otherwise known as the “twin tunnels” project). And we will be expanding our ability to extract greater amounts of water from our Kern County water banking programs to address future drought.

Resolving the V201 perchlorate challenge

Also in 2015, we expect to see the fruits of our efforts to remediate perchlorate contamination of Valencia Water Company’s V201 well near City Hall. The contamination resulted in the V201 well being removed from service in 2010.Since then, CLWA has assisted VWC in planning a perchlorate treatment facility that will be constructed in 2015 and will enable the V201 well to be returned to service, at no cost to SCV ratepayers and taxpayers due to a settlement we achieved with the Whittaker-Bermite property owners in 2007.

SCWD improvements

CLWA’s retailer, the Santa Clarita Water Division, has several significant projects under way, including:

- Utility Billing and Customer Information System Software Project: In 2014, SCWD completed the final phase of new billing software. In 2015, an enhanced “Customer Web Portal” will include new module links for online payment and information on user’s accounts and water consumption.

- Bouquet Canyon Road Pipeline Project: This project will provide a secondary source of supply to the northeastern portion of the SCWD service area, which will increase fire protection and emergency preparedness.

Continuing to build on past success

We’re proud of the successes CLWA has achieved, especially in terms of ensuring water supply reliability even in the face of a historic drought. In 2015, we’ll continue building on those successes on all possible fronts, from water conservation and efficiency programs to continuing our award-winning fiscal planning. Whether 2015 brings continued drought or some much-needed relief, we’re ready.

Tom Campbell is the president of the Castaic Lake Water Agency Board of Directors. His commentary reflects the agency’s views, and not necessarily those of The Signal.

← Back to 2015

About this record

How it was held, read and classified

Record details

Morris ID
131913
System
Morris section CMS (/section/…/article/… and /archives/…)
Reading copy
signalscv.com
Chosen by: only copy held. On this copy: words 874 (e-mail addresses counted as one token); reader comments 3 (counted, not reproduced here); images 0.
Extracted by
section_cms:articlebody_span
signal-extract/0.15 (2026-11-16)

Other copies

Held
None. The holding has this article from one host only.

How it was classified

Label
clearly-local
Judgment
A machine’s (recorded as machine), kept as one so it can be revisited.
Classifier
signal-localclass/0.7 (2026-11-12)
Local signals
  • url:section_33_local
  • text:valley_names [8 distinct/17 mentions: Santa Clarita, SCV, Valencia, Castaic, Castaic Lake Water, Valencia Water, Bouquet Canyon Road]
  • byline:named_writer_no_wire_credit [Tom Campbell]
National signals
none fired
Scores
local 8, national 0