ArchiveSCV
the-signal.com. The Santa Clarita Valley Signal. Back to the collection.

· signalscv.com, Wayback capture

Moving mountains in Castaic

High school site taking shape under extensive grading

Over the past several months, workers on the Castaic High School project have moved mountains in the Santa Clarita Valley.

Well, hills, at any rate.

Grading is continuing in earnest in Romero Canyon, with workers busily transforming the rugged terrain that will one day be home to the William S. Hart Union High School District’s long-planned high school to serve students in Castaic and Val Verde.

The site of the future school is not too far from homes in the area of Sloan Canyon and Quail Valley roads in Castaic.

It’s where the pavement ends, though, that the real work begins.

At the end of a dirt road, a small army of workers and a fleet of construction vehicles are setting the scene for what will become the Santa Clarita Valley’s newest high school.

“It’s been a force like this since the end of November,” said Randy Wrage of Romero Canyon LLC, the developer for the project.

The firm is charged with the job of moving more than 8 million cubic yards of cut and fill demanded by the project.

Even though the fruits of immense labor are already visible at the site, Wrage said grading is expected to continue for months.

It’s not just about moving dirt around, Wrage said. There’s a good amount of pre-work and engineering involved.

“The idea is not to start digging and then find something,” he said. “You want to know what’s underneath the ground before you uncover it.”

“This is the kind of effort that goes into making sure everything is perfect,” he added.

Once the site has been prepared, construction can begin on the buildings.

The goal is to open the school up with its inaugural class of ninth-graders in 2017, according to Hart district officials.

Though the project still has a long way to go, Wrage said he sees more than just dirt when he looks out on the site.

He sees where parking will be, where sports fields and classrooms will one day be built.

“I see it,” he says as he looks at the site. “I see a school.”

[email protected]

661-287-5525

On Twitter @LukeMMoney

Image not recovered0211_news_castaichigh_02_ad.jpg

← Back to 2015

About this record

How it was held, read and classified

Record details

Morris ID
133732
System
Morris section CMS (/section/…/article/… and /archives/…)
Reading copy
signalscv.com
Chosen by: most post text (words, email addresses normalised to one token). On this copy: words 355 (e-mail addresses counted as one token); reader comments 2 (counted, not reproduced here); images 2.
Extracted by
section_cms:articlebody_span
signal-extract/0.15 (2026-11-16)

Other copies (1)

Host
signalscv.com, under the old Morris system
http://www.signalscv.com:80/archives/133732/preview/
Captured7 June 2015, 09:11:20 UTC
CaptureThe archive does not serve this capture as a facsimile; the text is extracted from it.
SHA-256d371e7c96af8918b7056a78d8fed6c80cec5b7ab63305a765bd0e9a71cadfe08SHA-256 of the bytes the archive holds, recorded at intake. A SHA-1 of the same bytes, taken at the same time, equals the Wayback Machine’s own digest for this capture: 4FI4P5LB2UB23OVJSZF4LFPXI25HKMVY.
Holds alone
nothing measured beyond the chosen copy

How it was classified

Label
clearly-local
Judgment
A machine’s (recorded as machine), kept as one so it can be revisited.
Classifier
signal-localclass/0.7 (2026-11-12)
Local signals
  • url:section_36_local
  • byline:staff_marker [[address]]
  • text:valley_names [7 distinct/11 mentions: Santa Clarita, Castaic, Val Verde, Hart district, William S. Hart, Castaic High, Hart Union]
National signals
none fired
Scores
local 9, national 0