ArchiveSCV
the-signal.com. The Santa Clarita Valley Signal. Back to the collection.

· signalscv.com, Wayback capture

Long-awaited Canyon High School performing arts center taking shape

School’s out for summer, but there’s still plenty of activity at Canyon High School as workers shape the school’s long-awaited performing arts center.

Sounds of whirring and metallic clanging fill the air as workers coax walls out of tons of block and twisted spires of rebar.

The spot that will one day boast a stage to host student and community performances is visible amidst half-finished pillars and piles of wood.

“It’s a constantly revolving door of materials moving in and out of the site,” said Wayne Roemhild, a project manager with Balfour Beatty Construction, during a tour of the construction site last week.

The project at Canyon, and a plan to build a similar performing arts center at Saugus High School, will bring performance spaces at those two sites more in line with facilities at the other four comprehensive high schools in the William S. Hart Union High School District, according to district spokesman Dave Caldwell.

Caldwell said the total cost of the Canyon performing arts center will be $17.6 million.

“That includes everything, from the construction to the lights for the stage and all the furnishings,” he wrote in an email.

Construction on the approximately 18,560-square-foot, 449-seat performing arts center started back in September, Roemhild said, and has been “all engines go” since.

The construction site at Canyon did get a bit waterlogged during some rainstorms last winter, with workers having to pump out about 40,000 gallons of water.

“They had the greenest grass they’ve had in years,” Roemhild joked, noting the water was used to irrigate Canyon’s fields.

The performing arts center has been a long time coming for students and teachers alike at Canyon.

Canyon High Principal Jason d’Autremont said many of the school’s theater and choir productions were forced to go on stage elsewhere, some at Golden Valley High School.

“It’s a tremendous feeling just to have something that students and teachers and the community can utilize,” he said.

“This is something where we’re going to be prideful of showing what Canyon High School’s all about, and what we offer in our performing arts department,” he added.

Roemhild said “substantial completion” of the performing arts center — meaning the building is ready to be occupied — is expected by the end of January 2016.

Though it’s far from certain, d’Autremont said he’d like one of the first events in the new center to be Canyon’s open house.

“To have something that’s our own, that’s really something we’re going to take pride in,” d’Autremont said.

[email protected]

661-287-5525

On Twitter @LukeMMoney

← Back to 2015

About this record

How it was held, read and classified

Record details

Morris ID
139202
System
Morris section CMS (/section/…/article/… and /archives/…)
Reading copy
signalscv.com
Chosen by: only copy held. On this copy: words 423 (e-mail addresses counted as one token); reader comments 0 (counted, not reproduced here); images 5.
Extracted by
section_cms:articlebody_span
signal-extract/0.15 (2026-11-16)

Other copies

Held
None. The holding has this article from one host only.

How it was classified

Label
clearly-local
Judgment
A machine’s (recorded as machine), kept as one so it can be revisited.
Classifier
signal-localclass/0.7 (2026-11-12)
Local signals
  • url:section_36_local
  • byline:staff_marker [[address]]
  • text:valley_names [7 distinct/10 mentions: Saugus, William S. Hart, Saugus High, Canyon High, Golden Valley High]
National signals
none fired
Scores
local 9, national 0