ArchiveSCV
the-signal.com. The Santa Clarita Valley Signal. Back to the collection.

· signalscv.com, Wayback capture

Lane closures planned for work on Golden Valley bridge widening project

From Sunday night, November 15 to Friday morning, November 20, 2015 , and from Sunday night, November 22 to Wednesday morning, November 25, 2015, State Route 14 and the Golden Valley Road Bridge at State Route 14 will be subject to night closures to accommodate the Golden Valley Road Bridge widening project.

During the construction, the northbound State Route 14 will be closed from midnight to 6:00 a.m. and the southbound State Route 14 will be closed from 11:00 p.m. to 4:00 a.m. from November 15 to November 20, and November 22 to November 25. Both directions of the State Route 14 will never be closed at the same time. Golden Valley Road Bridge will also be subject to night closures from 9:00 p.m. to 5 a.m. on these dates as well.

State Route 14 traffic will be detoured utilizing respective State Route 14 off-ramps and on-ramps in each direction. In addition, signs will be posted along Golden Valley Road Bridge advertising the closure. Motorists who travel during the early hours through this area are advised to plan on slightly heavier traffic.

The Golden Valley Road Bridge widening project will add an additional two lanes of travel, one in each direction, for a total of four through lanes on the bridge, as well as a dedicated left turn lane to access the southbound State Route 14 and two left turn lanes to access the northbound State Route 14. This project will also add a pedestrian walkway on the north side of the bridge and a bike path on the south side of the bridge.

To watch the expansion of the Golden Valley Road Bridge online, check out the live Construction Cam on the City’s website.

For additional information on the Golden Valley Road Bridge widening project, including traffic schedules and detours, please contact Project Manager Harry Corder at (661) 290-2290 or [email protected] .

To receive email alerts on the Golden Valley Road Bridge widening project and other construction projects in the City, sign up at Santa-Clarita.com/eNotify .

Note: The Signal delivers press releases from reliable sources to provide up-to-the-minute information to our website readers. Information from these releases has not been vetted by The Signal news room. It may appear subsequently in news stories after it has been vetted.

Image not recoveredcity_of_santa_clarita_logo.jpg

← Back to 2015

About this record

How it was held, read and classified

Record details

Morris ID
144771
System
Morris section CMS (/section/…/article/… and /archives/…)
Reading copy
signalscv.com
Chosen by: only copy held. On this copy: words 379 (e-mail addresses counted as one token); reader comments 0 (counted, not reproduced here); images 1.
Extracted by
section_cms:articlebody_span
signal-extract/0.15 (2026-11-16)

Other copies

Held
None. The holding has this article from one host only.

How it was classified

Label
clearly-local
Judgment
A machine’s (recorded as machine), kept as one so it can be revisited.
Classifier
signal-localclass/0.7 (2026-11-12)
Local signals
  • url:section_36_local
  • byline:local_contributor_marker [Santa Clarita]
  • text:valley_names [3 distinct/18 mentions: Santa Clarita, Golden Valley Road, Golden Valley]
National signals
none fired
Scores
local 7, national 0