ArchiveSCV
the-signal.com. The Santa Clarita Valley Signal. Back to the collection.

· the-signal.com, Wayback capture

When the park goes dark

Long past the witching hour, the workers behind the curtains at Magic Mountain prepare the amusement

Editor’s note: First in an occasional series on the people who keep the SCV humming while the rest of us are snoring.

By moonlight, Six Flags Magic Mountain’s roller coaster tracks look like massive spider webs, their bright, colored bulbs like beads of dew.

As you walk underneath them, it’s so quiet you can hear the crunch of the gravel, still dotted with coins dropped from riders’ pockets.

Calm settles like fog over Six Flags Magic Mountain in the hours after the theme park closes.

It’s this calm — and the reprieve from the day’s heat and herding, screaming masses — that draw men like ride maintenance worker Rob Boden to the overnight shift.

“It’s quieter, and easier to get more done,” Boden said. The 28-year-old Canyon Country resident has worked at the park for five years.

He appreciates the theme-park enthusiasts, whose attendance keeps Boden and more than 3,000 others employed.

But their absence is a thrill of its own, giving ride maintenance operators a chance to roll up their sleeves for some real mechanic work.

About 100 employees work at the park after hours. Park-services workers spray down sidewalks in the midway as a children’s chorus from Thomas Town floats in the air.

Roving security guards in white trucks patrol the 260-acre grounds.

Meanwhile, maintenance crews tinker with the thrill rides that draw 3 million visitors each year.

The coasters and other rides that go bump in the day get poked and prodded all night. Every inch of the rides gets checked, as two crews of three maintenance workers look for loose bolts, cracked wheels or impaired welding.

Another crew of electrical mechanics checks the electrical components of the rides.

Danny Stucker, 24, of Valencia, stood at the operating station of Tatsu at about 1 a.m. Thursday, spouting instructions to a mechanic via microphone.

He jangled key after key as he fidgeted with the operating board of the ride.

One of the ride’s trains had a problem: Tatsu’s electrical brain wasn’t communicating with it.

“This is something unusual,” said Stucker, an electrical technician for the theme park. “We get more deeply seated issues” on the night shift, he said.

The day crews see problems like that and they set the train aside for after hours, when there aren’t throngs of people in a snaking line wondering what the holdup is.

Stucker’s shift begins at 6 p.m. It’s “run, run, run” for the first four hours until the park closes, he said.

That’s when the real trouble-shooting begins — like figuring out how to get Tatsu’s brain on speaking terms with Train X.

The ride-maintenance men say precision is key.

“Our job is to make sure they’re safe,” Stucker said. “This isn’t (the) Budweiser (plant). We can’t just toss 100 cans to the side of the assembly line (if we mess up). We all take it seriously.”

They know the rides inside and out and ride them daily.

“If I (rode Tatsu) right now, I’d know if something was wrong with it,” Stucker said.

Each seat on Tatsu — which takes riders 17 stories in two minutes by traveling 62 mph — has nine sensors, alerting operators when someone isn’t securely fastened.

Tony Beltran, of Palmdale, shined a flashlight on X2, another of the more challenging rides for the maintenance crews.

“It’s pretty high maintenance,” Beltran said. “The seats rotate; the rails move up and down. There’s just a lot of moving parts.”

Beltran, a soft-spoken man who served in the Air Force before starting at Magic Mountain three years ago, said he likes the challenge — and the fact that he gets to ride the new rides first.

His daughter Serenity, 11, gets to brag to her friends that her dad works at a theme park.

“She loves it,” he said.

Image not recovered0725_news_magic_mountain_4.jpg

← Back to 2010

About this record

How it was held, read and classified

Record details

Morris ID
31454
System
Morris section CMS (/section/…/article/… and /archives/…)
Reading copy
the-signal.com
Chosen by: only copy held. On this copy: words 633 (e-mail addresses counted as one token); reader comments 0 (counted, not reproduced here); images 2.
Extracted by
section_cms:articlebody_span
signal-extract/0.15 (2026-11-16)

Other copies

Held
None. The holding has this article from one host only.

How it was classified

Label
clearly-local
Judgment
A machine’s (recorded as machine), kept as one so it can be revisited.
Classifier
signal-localclass/0.7 (2026-11-12)
Local signals
  • text:valley_names [5 distinct/8 mentions: SCV, Valencia, Canyon Country, Magic Mountain, Six Flags]
  • byline:named_writer_no_wire_credit [By Natalie Everett]
National signals
none fired
Scores
local 5, national 0