ArchiveSCV
the-signal.com. The Santa Clarita Valley Signal. Back to the collection.

· signalscv.com, Wayback capture

Vasquez Rocks to get center

County supervisors approved plans to build a $9.7 million visitors center at Vasquez Rocks Natural Area during their meeting Tuesday.

Vasquez Rocks is one of only two natural parks in Los Angeles County without a modern visitors center, said Hayden Sohm, the county’s deputy director of parks and recreation.

The park attracts thousands of visitors annually and is a popular location to film movies and television shows.

The current park ranger’s office was built in the 1940s and hasn’t been updated for several years, Sohm said.

The staff that maintains and teaches classes there work out of a 50-foot construction trailer, said Kaye Michelson, a special assistant with parks and recreation.

More than 1,000 students take school field trips to Vasquez Rocks each year. But according to the project’s environmental review, there is only one permanent restroom for visitors — and it doesn’t work.

“There are (portable restrooms) and a couple of restrooms for staff and volunteers, but as far as a nice facility for the public, it’s very limited,” Sohm said.

The 2,700-square-foot center would remedy the restroom problem and includes plans to build classrooms that would be used to teach students on field trips about the history of the area and its iconic rock formations, Michelson said.

When it’s built, the visitor’s center will be the most environmentally friendly building in Los Angeles County, Sohm said. It will be built using recycled materials and its landscape will use California wildflowers that are drought tolerant.

It will be the only building in Los Angeles County with Leadership in Energy and Environmental Design Platinum certification in the county, he said.

The classification measures how effectively a building conserves water, electricity and waste.

According to county plans, construction on the visitor’s center is scheduled to begin in June. It could be completed by March 2012.

About $100,000 of the construction cost will be paid for with state grants. The rest will be paid using various county funds.

← Back to 2010

About this record

How it was held, read and classified

Record details

Morris ID
37951
System
Morris section CMS (/section/…/article/… and /archives/…)
Reading copy
signalscv.com
Chosen by: only copy held. On this copy: words 326 (e-mail addresses counted as one token); reader comments 0 (counted, not reproduced here); images 0.
Extracted by
section_cms:articlebody_span
signal-extract/0.15 (2026-11-16)

Other copies

Held
None. The holding has this article from one host only.

How it was classified

Label
clearly-local
Judgment
A machine’s (recorded as machine), kept as one so it can be revisited.
Classifier
signal-localclass/0.7 (2026-11-12)
Local signals
  • text:valley_names [1 distinct/4 mentions: Vasquez Rocks]
  • byline:named_writer_no_wire_credit [By Jonathan Randles]
National signals
none fired
Scores
local 4, national 0