Mr. Lamoureux,
My barbecue sits on a small concrete area in my backyard, which I want to make a little bigger. I’d appreciate any advice of how to make this job easier. I understand rock salt can give the surface better traction. Do I mix salt in with the concrete? Thank you,
Andy Y.
Hi Andy,
First, you form out for the new addition. Make sure the ground is clean, and you have a level 4” depth to pour the new concrete. Cut out any roots.
Hammer drill into the side of the existing slab and set rebar pins. This will keep the new concrete section from sinking or moving.
The salt is not mixed in with the concrete, but is thrown down on top of the still-wet concrete at the right moment. This is when experience comes in. If the concrete is too dry, the salt will bounce off and not give you the finish you’re looking for.
We call it broadcasting the salt, almost like you are feeding chickens. Match the amount of salt you use with the existing slab. If you want, you could come back with a rock salt roller, available at the rental yard. This is a round, steel roller that weighs about 25-30 pounds. Imprint the salt in the top of the new pour — pushing the salt crystals down will form the divots.
Once it bangs, sweep up all of the salt. I would wait two or three days so your broom doesn’t leave brush marks in the finish. Broom finishes are also very popular, but not if you’re going with a salt finish.
Some of the salt will remain after you brush it out. Hose it down and clean it up. Again, make sure two or three days has passed. Many times I’ve seen someone hose down on concrete that is still too wet — which just tears it up.
One thing to keep in mind, the longer you keep the concrete wet, the slower it will dry. The slower it dries, the harder it gets. The harder it is, the less likely you are to have cracking. It won’t prevent cracking, but it can be minimized.
It’s similar to stucco, the more water you put on it daily for the first 30 days, the slower it will cure, and the slower it will crack.
Robert,
I was trying to save a little money and do my own pool work. I was going to do an acid wash and make it look brand new.
I drained the pool out, but the next day the whole thing was raised up out of the ground by about 1 inch. What is going on here? Will it go back in place once I fill it up with water?
Willie W.
Hi Willie,
I’m sorry, but this is bad news. First, this is the worst time of year to be draining your pool. It’s the rainy season, which means there’s a lot of water in the ground. You’re probably sitting on a water table and in a low-lying area. The water got underneath and floated your pool up and out of ground.
Once you float your pool, you don’t have a lot of options. It’s going to have to be demolished down to the gunite and the steel. Basically you’re going to have to start over.
All of the water lines below will be broken, the main drains, everything. You could probably have the lines repaired so you can use the existing and do tie-ins on the drains and jets, but less the hole, you’re starting from scratch.
Unfortunately, I’ve seen this a few times over the years. Sorry, but it’s a total loss.
Hi Robert,
I’m thinking about putting in a patio cover in my back yard. Is a permit required? My neighbor said he got a permit for his. Is it necessary for just a cover?
Lee E.
Hi Lee,
Yes, it would have to be permitted. The is all of the attachment points have to be correct. It has to be bolted into the building properly. The right sized lags need to be used. You’ve got loads due to the pressures from the top and the footings need to be sized correctly to accommodate the weight of the cover.
Before you pour the concrete, you need steel in the footings. These are all things the Building Department will want to see.
Whether it’s an open lattice type overhang or a solid roof, you need permits. It all has to be inspected and put up right or it may fall during an earthquake, or it may collapse if not built properly. If it falls, it could hurt someone. Codes are in place and permits are required for safety. Everything has to be done to UBC — Uniform Building Code.
Hi Robert,
We recently discovered our HOA has some gate valves that do not shut off all of the way. I understand these need to be replaced because during an emergency the units could flood. The plumber said the best thing would be to rebuild the entire riser, repipe, replace the gate valve with a ball valve, and install new water bibs. He also said the PRV’s were old and should be replaced also. Do you agree that they should be replaced even if they are not broken? Thank you,
Marissa C.
Hi Marissa,
We are working on an identical situation. Sometimes, when you re-pipe or replace gate valves, sediments will cause the PRV’s to fail. When your old-style, obsolete PRV’s do fail, then the riser stack will have to be re-piped to accommodate the new body style.
I agree with your plumber. Replace the PRV’s now while the riser assembly is being rebuilt. It will save you money in the long run.
We have designed a custom, full-color The Signal/Your Home Improvements T-shirt we will give you if we answer your question. The T-shirt is available to be picked up at our office.
Robert Lamoureux has 25 years experience as a general contractor, with separate licenses in electrical and plumbing contracting. He owns IMS Construction Inc. in Valencia. His opinions are his own, and not necessarily those of The Signal. Opinions expressed in this column are not meant to replace the recommendations of a qualified contractor, after that contractor has made a thorough visual inspection. Send your questions to [email protected].