ArchiveSCV
the-signal.com. The Santa Clarita Valley Signal. Back to the collection.

· the-signal.com, Wayback capture

Expanded parking planned for Newhall Metrolink Station

The city is accepting bids for a Newhall Metrolink Station parking lot expansion that will include a new play area for the Newhall Community Center.

The project is estimated to cost about $700,000, senior city engineer Hoon Hahn said.

The project is federally funded and could begin this fall. It would be complete as early as January 2012, Hahn said.

About 30 of the 95 spaces would be built as permeable pavement, which means water can penetrate it and be naturally filtered before it reaches the nearby Santa Clara River.

This is the second city project that would include such pavement. It also meets the state's requirement for storm water drainage.

The 95 spaces will be built on vacant land north of the property. The play area, which will be an open field, will be north of the city's community center on Market Street.

← Back to 2011

About this record

How it was held, read and classified

Record details

Morris ID
48657
System
Morris section CMS (/section/…/article/… and /archives/…)
Reading copy
the-signal.com
Chosen by: only copy held. On this copy: words 144 (e-mail addresses counted as one token); reader comments 0 (counted, not reproduced here); images 0.
Extracted by
section_cms:articlebody_span
signal-extract/0.15 (2026-11-16)

Other copies

Held
None. The holding has this article from one host only.

How it was classified

Label
clearly-local
Judgment
A machine’s (recorded as machine), kept as one so it can be revisited.
Classifier
signal-localclass/0.7 (2026-11-12)
Local signals
  • text:valley_names [1 distinct/3 mentions: Newhall]
  • byline:named_writer_no_wire_credit [By Natalie Everett]
National signals
none fired
Scores
local 4, national 0