QUESTION:
I heard about the city ratifying its budget of $89 million. Where would a citizen see some of these local tax dollars at work?
ANSWER:
As part of the last City Council agenda, city staff brought to the council a series of infrastructure-related projects totaling $4.2 million. This includes the following: annual overlay project to resurface various streets to provide a smoother ride, enhance appearance of the area and extend economic life of the road; annual slurry project to seal cracks, enhance skid resistance and increase pavement life; access ramp construction to install pedestrian access ramps in high-demand areas, including transit routes, parks, schools and hospitals as required by the Americans with Disabilities Act; the curb and gutter repair program will install new curbs and gutters at various locations where flowline problems exist; the new sidewalk project will install sidewalks at various locations where none currently exist (the primary focus is in areas with high pedestrian usage and along pedestrian routes associated with the "Suggested Route to School" program); the annual sidewalk repair project will repair damaged sidewalks at various locations; annual median modification will alter medians to allow more efficient traffic flow by reducing congestion, creating safer turning lanes and restricting adverse traffic patterns; North Oaks Park and Santa Clarita Park parking lot pavement rehabilitation will resurface the lots to improve the condition of the pavement and enhance the appearance of these popular parks; Orchard Village Road traffic signal interconnect project will improve flow on Orchard Village Road by connecting the traffic signals and synchronizing their timing prior to overlay of the street; the 16th Street sidewalk installation project will install sidewalk on the south side of 16th Street, between Avenida Ignacio and Newhall Avenue.
If all of that isn't exciting enough for you, the city is spending over $1 million this year on construction of the Santa Clarita Sports Complex, in the vicinity of the Home Depot, off Soledad Canyon Road. This facility will include a skateboard park, indoor basketball and racquetball courts, plus shower and locker facilities. More information regarding the 1998-99 budget is available by calling city budget officer Paul Zaengle at 255-4909.
QUESTION:
I understand the city is realigning Wiley Canyon Road. Where and when will this be happening?
ANSWER:
On Sep. 9, 1997, the City Council approved the new alignment for Wiley Canyon Road. This will include construction of two lanes using an eastern portion of right-of-way; curb, gutter, and a 7-foot sidewalk on the east side; a 5-foot paved shoulder lane next to the curb for bicycle use; an asphalt walk area on the west side from Powell Street to Wabuska Road; and a concrete retaining wall to relieve the existing steep slope impacts on the roadway.
Construction is scheduled to begin in September, with completion planned for April. For additional information, contact the city's Engineering Department at 255-4345.
* * *
Questions are answered by the City of Santa Clarita. Write to the City in care of The Signal, PO Box 801870, Santa Clarita, CA 91380-1870.