ArchiveSCV
the-signal.com. The Santa Clarita Valley Signal. Back to the collection.

· the-signal.com, Wayback capture

Redevelopment: The patient is still breathing

The redevelopment of Downtown Newhall is going to be a long haul— so when the headline reads, “Newhall redevelopment efforts not paying off,” you’d be well-advised to mentally add the word, “Yet.”

In the grand scheme of things, Downtown Newhall’s redevelopment has only begun, so it’s a little early to throw in the towel and claim that redevelopment hasn’t worked there because the redevelopment area is too small.

There have been rumblings lately about the current redevelopment area not generating enough money. If anyone at City Hall has designs on using slow progress in Newhall as an excuse to widen the redevelopment area, they should think twice. It’s too soon to draw such conclusions.

It’s true that Downtown Newhall property values have not escalated the way anyone would have hoped by this point in time, and it’s true that the city of Santa Clarita’s redevelopment agency has so far spent approximately $2.4 million while failing to realize projected increases in property tax revenue.

However, that’s not a complete picture of the situation.

Of that $2.4 million, more than one-third has been spent on attorneys’ fees and consultant costs— and many of those expenses are not directly related to the Downtown Newhall redevelopment project at all.

‘In the grand scheme of things, Downtown Newhall’s redevelopment has only begun, so it’s a little early to throw in the towel and claim that redevelopment hasn’t worked there’.

In fact, a significant portion of the revenue spent so far can be traced to the city’s aborted attempt at a massive $1.1 billion redevelopment plan that included vast amounts of territory beyond Downtown Newhall.

In essence, that $2.4 million consists mostly of the bills for the overly ambitious plan the city put forth after the 1994 earthquake. That plan was challenged in court by the Castaic Lake Water Agency— which alleged the proposal violated state redevelopment law and would unfairly tap tax revenue that would otherwise go to the CLWA and other government agencies.

If nothing else, the $1.1 billion plan was too big and too costly.

The city eventually adopted a much more realistic and worthy plan to redevelop Downtown Newhall, the community’s historic commercial hub that had fallen into blight over the past couple of decades.

The “vision” for a revitalized downtown is to create an area that is once again a commercial hub, anchored by performing arts groups and restaurants.

To date, depending on how one breaks down the numbers, you could say approximately $200,000 has been spent on “real” Downtown Newhall redevelopment projects, and about $1 million altogether if you include consulting fees and Newhall-related attorney fees— in any case a far cry from $2.4 million.

The “real” downtown redevelopment expenses include worthwhile items like the $63,851 spent on the area’s facade improvement program, designed to help businesses in the downtown corridor put their best face forward.

In addition to the redevelopment funds, the city has spent a hefty chunk— $14.7 million— from other sources to finance projects like the new Metrolink station and improvements to Railroad Avenue. These projects, while not funded by redevelopment, should prove over the long haul to dovetail quite nicely with the redevelopment projects.

But the bottom line is that redevelopment of Newhall is, in fact, a long haul. At this early stage— with two new community-based theater groups just starting their operations in downtown digs— it’s too soon to draw conclusions.

And in any event, it’s too soon to start trying to spread the wings of redevelopment beyond Downtown Newhall.

The Signal's opinion is always lableled "Editorial." All other views expressed on the Opinion pages represents individual opinions and are not necessarily those of the newspaper.

← Back to 2000

About this record

How it was held, read and classified

Record details

Morris ID
Not a Morris ID. This record is keyed ts-df:/editorial/signal/0200/021200.html.
System
date-file pages (/desk/MMYY/MMDDYY.html)
Reading copy
the-signal.com
Chosen by: only copy held. On this copy: words 612 (e-mail addresses counted as one token); reader comments 0 (counted, not reproduced here); images 0.
Extracted by
datefile:SLUG_to_rule
signal-extract/0.15 (2026-11-16)

Other copies

Held
None. The holding has this article from one host only.

How it was classified

Label
clearly-local
Judgment
A machine’s (recorded as machine), kept as one so it can be revisited.
Classifier
signal-localclass/0.7 (2026-11-12)
Local signals
  • url:datefile_editorial
  • text:valley_names [4 distinct/16 mentions: Santa Clarita, Newhall, Castaic, Castaic Lake Water]
National signals
none fired
Scores
local 6, national 0