The Santa Clarita Planning Commission had not made a decision by press time Tuesday on a proposal by The Master’s College to build a three-story dorm building on the school’s campus.
As proposed by the college, the new building, which would be visible from both Placerita Canyon and the Jan Heidt Metrolink Station, would house 162 students in 81 rooms.
It would house students who now reside in off-campus housing along San Fernando Road and commute to campus, school officials said.
One of the issues city staff discussed was the shortfall in parking limits identified in the city’s Unified Development Code (UDC). Those city regulations state that one space is required for every 100 square feet of building— in this case the structure is 24,742 square feet.
Under that formula, 288 new spaces would be required by city standards, Senior City Planner Lisa Hardy said.
But as proposed, the project would only add 31 spaces, creating 52 and removing 21 for the dorm building.
In her staff report, Hardy said the project falls short by 257 spaces, though she listed some justifications for granting the requested variance from the UDC.
She said the college had developed a formula that takes into consideration 373 spaces for on-campus housing— including the 31 new spaces that would come along with the dorm— that would only require 361 spaces for the proposed 729 on-campus residents.
That formula led to Hardy’s statement in her staff report that not only would there not be a deficit in the number of spaces— but a 12 spot surplus.
College officials also said the dorms would not increase the student population itself, though the on-campus population would see an increase in the way of students who now commute from off-campus .
Other issues that were discussed at the meeting included lighting, the addition of sewers as well as a college promise that it would prepare a master plan for any additional build-out the college plans to do.
In addition, Planning Commission Chair Dennis Ostrom and Rick Winsman had concerns of the overall impact of development in the area, which includes the proposed McGrath school site and the Dockweiler extension, among other projects.
Another of the those projects, a Master’s College performing arts center/chapel that was denied once before by the Planning Commission, is being reworked and will come back before the commission as a revised project in a different location, school officials said.
