ArchiveSCV
the-signal.com. The Santa Clarita Valley Signal. Back to the collection.

· the-signal.com, Wayback capture

Foes to formulate strategy to fight mining project

A community strategy workshop focusing on a proposed surface mining operation drew approximately 200 concerned citizens to the Canyon High School gymnasium Wednesday night.

The workshop was organized by the city of Santa Clarita , following a May 11 council meeting during which the city government authorized $50,000 “to bring on board an environmental consultant team and to launch a community-wide mobilization program,”

Jeff Lambert, director of planning and building services for the city, spoke during the workshop.

• Photo by Joseph Paolinelli

according to city associate planner Lisa Hardy.

The proposed operation, the Soledad Canyon Sand & Gravel Mining Project, sponsored by Transit Mixed Concrete Company , involves the surface mining of 83 million tons of aggregate on a 460-acre site just outside the eastern boundary of the city, east of State Route 14, over a 20-year period.

The city and area residents have expressed concerns over the plan, based on the impact the mining could have on air quality, water resources, and the continuous running of truck traffic to transport the aggregate.

The proposal is going through a series of hearings before the county regional planning commission.

The purpose of Wednesday night’s meeting was to bring area environmental activists, residents and city staff together to share information and plan strategies to address specific issues in the planned mining operation.

Jeff Lambert, the city’s director of planning and building services, gave the audience an overview of the city’s activities to date, including a report on what the city has called “major flaws in (Transit Mixed’s draft) environmental impact report.”

Among the inadequacies noted, according to the city report, is that the “EIR doesn’t adequately describe or analyze the location of three off-site water wells and a water pipeline,” that the “discussion of land uses and residential development in the project area is dated and minimal— impacts to local communities not adequately analyzed.” On the geotechnical level, the city found that the “maximum earthquake potential on nearby faults, site ground motion and site classification are incorrectly identified.”

A chart the city displayed, allowing participants to note their concerns with color-coded paper dots, indicated that the operation’s effect on air quality, water resources, and increased traffic were the issues that troubled residents most.

Hardy said the city staff was gearing up for the next round of public hearings before the county planning commission July 14, at which opposition to the project will be heard.

“We want to cover the full range of community concerns,” Hardy said, “and make sure we have speakers and community leaders coordinated on that.”

Image not recovered061899b.jpg

← Back to 1999

About this record

How it was held, read and classified

Record details

Morris ID
Not a Morris ID. This record is keyed ts-df:/main/0699/061899a.html.
System
date-file pages (/desk/MMYY/MMDDYY.html)
Reading copy
the-signal.com
Chosen by: only copy held. On this copy: words 427 (e-mail addresses counted as one token); reader comments 0 (counted, not reproduced here); images 1.
Extracted by
datefile:START_STORY
signal-extract/0.15 (2026-11-16)

Other copies

Held
None. The holding has this article from one host only.

How it was classified

Label
clearly-local
Judgment
A machine’s (recorded as machine), kept as one so it can be revisited.
Classifier
signal-localclass/0.7 (2026-11-12)
Local signals
  • url:v2_datefile_main
  • text:valley_names [3 distinct/3 mentions: Santa Clarita, Soledad Canyon, Canyon High]
National signals
none fired
Scores
local 5, national 0