ArchiveSCV
the-signal.com. The Santa Clarita Valley Signal. Back to the collection.

· oldsite.the-signal.com, Wayback capture

"LIVE" From City Hall

The Future of So. Cal. Transit

There is no question that a huge challenge we face in the Santa Clarita Valley is transportation and how to get to where we need to be in a stress-free, efficient manner.

A dream of many Santa Clarita commuters who have to travel to work on the freeways Monday through Friday is to make it to their destination without sitting in traffic. However, in the Southern California world we live in, much of our day is more than likely spent on a freeway somewhere commuting to and from work. Countless hours are wasted each week sitting in traffic, trying to get from here to there.

Imagine what life would be like if Santa Clarita commuters were able to travel, morning or night, to Los Angeles in 20 minutes or less. Although this may sound like a fantasy, the city of Santa Clarita is working on an exciting mode of transportation to turn this dream into reality.

The city, as a member of the OrangeLine Maglev Development Authority, has been working to implement an elevated magnetic levitation train that would run from Palmdale to Orange County - a distance of 110 miles.

Running at speeds of up to 180 mph, maglev uses clean, electromagnetic levitation to lift and propel passenger trains along an elevated monorail guideway. The trains float over a guideway using the basic principles of magnets to replace the old steel-wheel and -track trains.

Santa Clarita and Southern California commuters would be hard-pressed to find a faster, more reliable form of transportation. The high-speed OrangeLine maglev system would improve our Santa Clarita environment and economy. With a significant reduction of cars on the road, the development of a local maglev transit system would provide a positive impact to air quality and traffic in the future. Additionally, the system would support new housing, commercial, and industrial development located around the maglev stations.

The preliminary engineering phase of the OrangeLine Maglev began in fall 2005.

The Authority is now working with 14 member cities including Santa Clarita, Palmdale, Artesia, Cerritos, Huntington Park and Downey to create ridership modeling assumptions, determine alignment and station locations, and generally plan out the operation of the maglev. City staff members have been working closely with the Authority to provide valuable information for the planning and implementation stages of the OrangeLine Maglev.

Last month, the Authority board approved the final milestone report confirming the feasibility of the project. The OrangeLine, projected to be operational by 2012, would service more than 182,000 riders per day at a price of $21 one way.

It would cost an estimated $200 million to design; $13 billion to $24 billion to construct; and would run above existing highway and railroad corridors.

Funding for the groundbreaking project would be paid through a public-private partnership in which the high-speed maglev transportation system would generate sufficient operating revenues to cover capital and operating costs.

Building more roads will not be enough to ensure that the transportation needs of the future can be met. To plan for the future, our city must try alternative methods of reducing traffic. One of the ways our city is preparing to deal with the current and projected traffic situation is by participating in the maglev project.

The first operational maglev system, which connected Shanghai with Pudong Airport in China, went into service in December 2003. The maglev system has been under development for more than 25 years in Germany and has carried more than 500,000 passengers since operations began in 1984.

Our city is excited to be involved in the multi-agency development process, as we recognize the significant impact the maglev could have on traveling in Southern California in the future.

For more information about the city's on the innovative, proposed OrangeLine Maglev system, feel free to contact me at City Hall, or call Debbie Helbig in the city's Engineering Division at (661) 284-1427, or visit orangeline.calmaglev.org.

Marsha McLean is mayor of the city of Santa Clarita. Her column reflects her own views, and not necessarily those of The Signal.

Image not recovered00001142-constrain-240x1099.jpeg
Image not recovered00001143-constrain-240x854.jpeg

← Back to 2006

About this record

How it was held, read and classified

Record details

Morris ID
Not a Morris ID. This record is keyed ts-ds:35144.
System
displaystory pages (?module=displaystory)
Reading copy
oldsite.the-signal.com
Chosen by: latest capture. On this copy: words 671 (e-mail addresses counted as one token); reader comments 0 (counted, not reproduced here); images 2.
Extracted by
displaystory:2007_font_head
signal-extract/0.15 (2026-11-16)

Other copies (1)

Host
the-signal.com
http://www.the-signal.com/?module=displaystory&story_id=35144&format=html
Captured20 November 2007, 00:09:03 UTC
CaptureThe archive does not serve this capture as a facsimile; the text is extracted from it.
SHA-256a07f1ceb5b499398ae8831714435ecb9dd867d01271152425959170cf3b9d34cSHA-256 of the bytes the archive holds, recorded at intake. A SHA-1 of the same bytes, taken at the same time, equals the Wayback Machine’s own digest for this capture: AIBW3VQ2FA4YNAUULPE3HVM3VS4EYQUL.
Holds alone
nothing measured beyond the chosen copy

How it was classified

Label
clearly-local
Judgment
A machine’s (recorded as machine), kept as one so it can be revisited.
Classifier
signal-localclass/0.7 (2026-11-12)
Local signals
  • text:valley_names [1 distinct/8 mentions: Santa Clarita]
  • byline:named_writer_no_wire_credit [Commentary by Marsha McLean]
National signals
none fired
Scores
local 4, national 0