ArchiveSCV
the-signal.com. The Santa Clarita Valley Signal. Back to the collection.

· the-signal.com, Wayback capture

Fix-It Staff Short in Hart

The Hart district maintenance department needs to add seven new positions in order to shorten the time it takes to complete work orders, according to a recently released annual report.

"Our manpower was the same when the district had six schools, and now we have 12 schools," said Rob Gapper, chief operations officer for the William S. Hart Union High School District. "We've added three supervisors and that has really helped, because we've been able to manage the projects better."

At the time of the report in October, seven positions remained unfilled, including a carpenter, electrician, plumber, a HVAC (heating, ventilation and air conditioning) expert and three general maintenance workers.

"We are currently testing for most, if not all, of these positions, because we want to fill them as soon as possible," Gapper said.

The district has had trouble finding skilled workers in the past due to all the construction taking place in the Santa Clarita Valley.

"I think that perhaps people in the skilled trade enjoy the freedom that working in the contractor business affords them. With the school district, they're tied down to a specific job and a specific assignment," Gapper said, adding that the district salaries are competitive with other districts in the area.

The number of work orders waiting to be completed in the district is currently at about 15 per school, which isn't bad, according to Gapper.

"When a work order comes in, we don't have someone waiting there to go fix it. We have our people out in the field, so there's a queue involved," he said.

One of the goals listed in the report is to reduce the response time to complete work orders by 50 percent in the next eight months. Gapper would also like to provide more employee training, improve communications and meet with school principals annually to plan summer maintenance projects.

Once workers are hired and the staff is complete, the department should be able to do some preventative maintenance at the schools, like painting and regularly scheduled inspections of heating, air conditioning and irrigation systems, Gapper said.

"We'd like to have ongoing roof repairs instead of waiting for a leak to develop," he said. "Once we get a complete staff, we'll be able to do all that."

[email protected]

← Back to 2007

About this record

How it was held, read and classified

Record details

Morris ID
Not a Morris ID. This record is keyed ts-ds:51649.
System
displaystory pages (?module=displaystory)
Reading copy
the-signal.com
Chosen by: only copy held. On this copy: words 379 (e-mail addresses counted as one token); reader comments 0 (counted, not reproduced here); images 0.
Extracted by
displaystory:2007_font_head
signal-extract/0.15 (2026-11-16)

Other copies

Held
None. The holding has this article from one host only.

How it was classified

Label
clearly-local
Judgment
A machine’s (recorded as machine), kept as one so it can be revisited.
Classifier
signal-localclass/0.7 (2026-11-12)
Local signals
  • byline:staff_marker [[address]]
  • text:valley_names [4 distinct/4 mentions: Santa Clarita, Hart district, William S. Hart, Hart Union]
National signals
none fired
Scores
local 6, national 0