ArchiveSCV
the-signal.com. The Santa Clarita Valley Signal. Back to the collection.

· the-signal.com, Wayback capture

Residents address concerns over trailer relocation

Residents near Meadows Elementary School in Valencia confronted board members from the Newhall School District Tuesday with concerns about the relocation of YMCA trailers on campus.

The trailers, which house before- and after-school programs for children, will be moved when the district begins modernization of the elementary school.

The homeowners are concerned the trailers will be moved too close to homes and will cause additional traffic and parking problems.

?The move would surely affect home values and create a darkened crime area for mischief makers,? said John Warling, a homeowner since 1987.

Neighbors, he said, have noted an increase of problems over the years around the school.

?It?s beer parties, it?s (kids) leaping off the buildings, and we end up calling the police,? Warling said. ?Not to mention the traffic coming off Lochmoor (Road). It?s already traveled way too much and it?s already crowded with school pick-ups.?

Other neighbors brought up concerns about the liability they will incur if someone gets hurt.

Newhall Assistant Superintendent Don Hughes said the residents have legitimate concerns and the district is trying to address the situation.

?We showed them other options (that were considered),? he said.

The YMCA has daycare centers at several Newhall School District campuses including Peachland, Wiley Canyon and Old Orchard. The children utilizing the before- and after-school care are primarily students at the adjacent elementary school. The district also contracts with Sunshine Child and Learning Centers at other school sites.

At the Meadows YMCA, approximately 25 children use the facility in the morning and about 50 in the afternoon.

?We would rather have kids in a supervised program than a latch-key situation,? Hughes said.

Meadows, which was built in 1975, will undergo extensive renovation using state funds and Measure K moneys.

Hughes said the school will get upgraded electrical and plumbing, solid doors and partitions, and handicap accessibility.

Modernization is scheduled to begin this summer and should take about nine months to complete.

The school board will consider the suggestions given by the residents, including the possibility of using land in the adjacent park.

?I think (the board) is listening and I praise them for checking with any neighbors,? Warling said. ?The Y is providing a much needed service and no one is questioning that. But moving the trailer just a matter yards is something we?re all used to.?

← Back to 2003

About this record

How it was held, read and classified

Record details

Morris ID
Not a Morris ID. This record is keyed ts-vs:2017.
System
ViewStory pages (/News/ViewStory.asp)
Reading copy
the-signal.com
Chosen by: only copy held. On this copy: words 389 (e-mail addresses counted as one token); reader comments 0 (counted, not reproduced here); images 0.
Extracted by
viewstory:font_body
signal-extract/0.15 (2026-11-16)

Other copies

Held
None. The holding has this article from one host only.

How it was classified

Label
clearly-local
Judgment
A machine’s (recorded as machine), kept as one so it can be revisited.
Classifier
signal-localclass/0.7 (2026-11-12)
Local signals
  • text:valley_names [3 distinct/6 mentions: Valencia, Newhall, Newhall School District]
  • byline:named_writer_no_wire_credit [Patti Rasmussen]
National signals
none fired
Scores
local 4, national 0