ArchiveSCV
the-signal.com. The Santa Clarita Valley Signal. Back to the collection.

· the-signal.com, Wayback capture

Schoolwork in Progress

Backpacks were ready and stacked by the front door the night before. Bulletin boards had been decorated and desks assigned as parents and teachers in the Saugus Union School District greeted more than 10,000 students for the first day of the 2003-04 school year today.

At two schools in the district, however, hard hats and heavy equipment will displace the student population for a couple more weeks as Rosedell and Rio Vista Elementary schools undergo multi-million-dollar renovations.

For them, school will open officially on Aug. 27.

The modernization projects, funded in part by Measure E, a local bond passed by Saugus voters last year, have been under way ever since the students left for summer break.

A snafu in the bid process, however, resulted in the bids coming in significantly higher than the district estimated — up to a 30 percent increase — causing a slight delay as administrators, architects and the construction management team met to evaluate the costs.

Harold Pierre, the district’s facilities director, said changes will probably be made to some of the plans.

“We will evaluate the bids, evaluate the estimates and evaluate the project design,” Pierre said. “The (construction manager) will make recommendations and we will present those to the (school) board.”

Both schools are slated to receive new multi-purpose rooms, additional classrooms, administration buildings and technology and electrical upgrades. Rio Vista will also have a two-story, nine-classroom addition to serve the 1,000 students currently enrolled in the 25-year-old school.

Modernization will continue during the school year. Fencing will be placed between the students and the construction site as a safety precaution.

A school facility committee has helped develop the master plan for each school campus and is kept abreast of the situation, Pierre said.

Board President Judy Umeck said everyone involved at both Rio Vista and Rosedell has been patient and cooperative as the district reviews the projects.

“We need to find out what happened,” Umeck said. “We have a budget and we have a finite pot of money that is committed to the whole Saugus school community. We need to revisit the projects to make sure they all conform to the budget.”

The board will meet Tuesday in the Saugus Union School District office, 24930 Avenue Stanford, Valencia. For more information, call the district at 294-7500.

Image not recovered081303school.jpg

← Back to 2003

About this record

How it was held, read and classified

Record details

Morris ID
Not a Morris ID. This record is keyed ts-vs:2972.
System
ViewStory pages (/News/ViewStory.asp)
Reading copy
the-signal.com
Chosen by: only copy held. On this copy: words 383 (e-mail addresses counted as one token); reader comments 0 (counted, not reproduced here); images 1.
Extracted by
viewstory:font_body
signal-extract/0.15 (2026-11-16)

Other copies

Held
None. The holding has this article from one host only.

How it was classified

Label
clearly-local
Judgment
A machine’s (recorded as machine), kept as one so it can be revisited.
Classifier
signal-localclass/0.7 (2026-11-12)
Local signals
  • text:valley_names [3 distinct/7 mentions: Valencia, Saugus, Saugus Union]
  • byline:named_writer_no_wire_credit [Patti Rasmussen]
National signals
none fired
Scores
local 4, national 0