A handful of residents expressed their concerns regarding the first phase of the proposed 20,885-home Newhall Ranch project at a scoping meeting Thursday night.
The meeting, which was held by Los Angeles County Department of Regional Planning, is designed to address the potential significant impacts of River Village, which is the first of five phases at Newhall Ranch.
The developer, The Newhall Land and Farming Co., plans to erect 1,444 residential units, an elementary school, a community park and three recreational facilities. A river trail is also proposed, which will be bounded by the Santa Clara River on the south, Castaic Creek on the east and Chiquita Canyon Road at state Route 126 on the north.
The meeting was moderated by Lloyd Zola from LSA Associates, a consulting firm in Riverside.
Zola told those in attendance the goal of the meeting was to discuss issues which should be addressed in River Village?s environmental impact report.
?What we are doing tonight is creating a public record that will be included in the EIR,? Zola said.
Although the county already approved an environmental impact report for Newhall Ranch?s entire planning area, separate EIRs will need to be completed for each of the five phases.
An initial study conducted by county planning officials determined the River Village project could significantly impact local schools, traffic, water quality and air.
Saugus resident Bill Wittenberg said the concerns he would like the EIR to address include the 7 million cubic yards that will have to be moved during the development phase, where fire stations would be located, and traffic along residential streets, which he said could pose some safety hazards to children.
?From what I see on the maps, all the roads look like connector roads,? he said.
Castaic resident Phil Hof voiced his worries over water availability, traffic, and the impact of such projects on the Santa Clara River.
He said while the maps represent where bank stabilization would occur, it does not show an accurate depiction of how much fill River Village would entail.
?(What the maps indicate), these are just adjectives, not numbers,? Hof said.
Hof added that such a project should take advantage of the opportunities that surround the planning process, especially with respect to water reclamation.
?There is an opportunity to come up with innovative uses of the reclaimed water in the area,? Hof said.
Barbara Wampole, vice-chair of the Friends of the Santa Clara River, urged the county to conduct an independent biological survey on River Village, as well as protect the Significant Ecological Area (SEA 23), by constructing adequate buffer zones.
Members of the Santa Clarita Valley Bicycle Coalition said they would like to see more trails for bicyclists to travel on, as well as see alternate modes of transportation.
A member from the California Native Plant Society said they would like to see studies conducted that would point out the effects of the project on plant life and plant communities.
County officials said the contents draft EIR should be complete by the end of April, with the 45-day review period of the final EIR scheduled between late spring and early summer. Formal public hearings with Regional Planning are scheduled for fall, and are expected to last into 2005.
Copies of the initial study are available until March 1 at Canyon Country, Newhall and Valencia libraries. Written comments must be received no later than March 4 at 5 p.m. and must be sent to Dr. Hsiao-ching Chen, AICP, County of Los Angeles Department of Regional Planning, Impact Analysis Section, 320 West Temple Street, Los Angeles, CA 90012-3225. Or call (213) 974-6461.
