Some see it as a panacea to all the traffic woes in the Santa Clarita Valley. Others see it as an avenue for more traffic, more smog and more overcrowding to arrive in the SCV.
The truth may lie somewhere between, but there’s little doubt that the 8 1/2-mile-long cross-valley connector will be the most expensive road in the valley’s history with a price tag of some $245 million.
The much-touted connector between Interstate 5 and state Route 14 will actually be much like any other main roadway in the SCV, similar to Valencia Boulevard or McBean Parkway, said Mark Yamarone, capital planning and programming administrator for the city of Santa Clarita.
Made up of Golden Valley Road on the east side of town and Newhall Ranch Road in the middle and western sections of the SCV, the cross-valley connector will range between six and eight lanes with a generous median. Sections of it will include a bike lane.
And, yes, it will have signals. Not too many at first, but more as the city infills.
In fact, much of the cross-valley connector already exists, complete with signals. Newhall Ranch Road between Bouquet Canyon and Rye Canyon roads is part of the connector. So, too, is Golden Valley Road, which will soon be open to motorists from state Route 14 to Redview Drive.
Officials broke ground last week on a “flyway,” or extended bridge, that will carry traffic over Soledad Canyon and Golden Triangle roads. Construction on the 35-foot-tall, $32-million bridge is expected to begin later this month.
Progress is also being made on efforts to close “the gap” in Newhall Ranch Road between Rye Canyon Road and state Route 126.
But the sticking point will be in the middle of the valley: A second flyway must carry traffic across the Santa Clara River. That bridge is not yet funded, will be very expensive and will require extensive studies by environment-protecting agencies.
Further, the link-up between the second flyway and the existing section of Newhall Ranch Road must be constructed through a much-criticized development planned by the Newhall Land and Farming Co. for the north shore of the Santa Clara River.
Newhall Ranch has said it will build that stretch of the connector if the city approves its development. Critics say the development, called Riverpark, will pack too many people into the area and damage a delicate ecosystem. They want Riverpark dumped, and some want the connector dumped as well.
But the cross-valley connector is on the top of the city’s priority list, and officials say it will eventually be completed.
Other major roadways slated to cross the valley include Magic Mountain Parkway and Via Princessa. Both are on hold while officials grapple with cleaning up 1,000 acres of polluted ground at the former Whittaker-Bermite site. Both roadways would cross the site.
