ArchiveSCV
the-signal.com. The Santa Clarita Valley Signal. Back to the collection.

· the-signal.com, Wayback capture

Interstate 5 Closures Loom

State officials kickoff a $41.6 million project to connect freeway carpool lanes.

A two-year construction project to link carpool lanes on Interstate 5 and state Route 14 begins this week, with partial lane closures tonight and the promise of total freeway shut-downs occasionally during the next two years.

State workers will close parts of Interstate 5 and the 210 freeway this week, beginning the $41.6 million improvement campaign.

The closures will be “temporary, and are going to culminate in a much better, more efficient freeway system for all of us, actually,” said Jeanne Bonfilio, spokeswoman for the California Department of Transportation.

The project is part of a larger statewide plan to link all of the carpool lanes in California. When this leg of the plan is complete, motorists will be able to drive from SR-14 to I-5, or vice versa, while staying in the carpool lane, the spokeswoman said.

Tonight’s closures include the westbound 210 Foothill Freeway connector to northbound I-5, one lane of northbound I-5 from Balboa Boulevard to SR-14, and the Paxton Street onramp to northbound I-5, beginning at 6 p.m., 7 p.m. and 8 p.m. respectively.

Bonfilio said more closures are coming up later in the week, but the department had not released the specifics Monday. Lane closures and occasional full-freeway closures will continue throughout the two-year construction period. Most work will be done during nighttime hours.

She recommended substituting side streets for the freeways during closures, such as Sierra Highway for SR-14 or The Old Road and Balboa Boulevard for Interstate 5.

Meanwhile, a $26 million project to improve state Route 126’s interchange with I-5 will be in the works through Friday, May 20. During this period, state workers are set to shut down a northbound lane and a southbound lane between Hasley Canyon and Rye Canyon roads daily from 6 a.m. to 3 p.m.

Eastbound SR-126 connectors with I-5 will also be closed from 9 a.m. to 3 p.m., along with one SR-126 lane in each direction between Castaic Junction and I-5, according to Caltrans.

← Back to 2005

About this record

How it was held, read and classified

Record details

Morris ID
Not a Morris ID. This record is keyed ts-vs:7146.
System
ViewStory pages (/News/ViewStory.asp)
Reading copy
the-signal.com
Chosen by: only copy held. On this copy: words 328 (e-mail addresses counted as one token); reader comments 0 (counted, not reproduced here); images 0.
Extracted by
viewstory:font_body
signal-extract/0.15 (2026-11-16)

Other copies

Held
None. The holding has this article from one host only.

How it was classified

Label
clearly-local
Judgment
A machine’s (recorded as machine), kept as one so it can be revisited.
Classifier
signal-localclass/0.7 (2026-11-12)
Local signals
  • text:valley_names [3 distinct/3 mentions: Castaic, Hasley Canyon, Sierra Highway]
  • byline:named_writer_no_wire_credit [Brandon Lowrey]
National signals
none fired
Scores
local 4, national 0