ArchiveSCV
the-signal.com. The Santa Clarita Valley Signal. Back to the collection.

· signalscv.com, Wayback capture

Hart board to choose construction method for Castaic site

The William S. Hart Union High School District is planning to select the method of construction for the Castaic High School project during its board meeting at 7 p.m. today.

These methods have been evaluated by the board for several weeks now to determine the best balance of quality, time and cost.

One of the more recent options reviewed is a lease-leaseback option, in which the school district can lease the property to a contractor for a minimum of $1. Lease payments are then made to the builder after the completion of the project.

The school district could also choose to hire a general contractor who oversees all the subcontractors or it could choose to hire all the subcontractors individually and oversee each contract personally.

← Back to 2016

About this record

How it was held, read and classified

Record details

Morris ID
153337
System
Morris section CMS (/section/…/article/… and /archives/…)
Reading copy
signalscv.com
Chosen by: only copy held. On this copy: words 125 (e-mail addresses counted as one token); reader comments 0 (counted, not reproduced here); images 1.
Extracted by
section_cms:articlebody_span
signal-extract/0.15 (2026-11-16)

Other copies

Held
None. The holding has this article from one host only.

How it was classified

Label
clearly-local
Judgment
A machine’s (recorded as machine), kept as one so it can be revisited.
Classifier
signal-localclass/0.7 (2026-11-12)
Local signals
  • url:section_36_local
  • byline:staff_marker [Signal Staff]
  • text:valley_names [4 distinct/5 mentions: Castaic, William S. Hart, Castaic High, Hart Union]
National signals
none fired
Scores
local 9, national 0